Not an emergency, but don't leave it
Getting solar, a battery or an EV charger? Your switchboard may need upgrading first
Each connects to your switchboard on its own circuit. Old fuse boards, full boards and asbestos panels often can't take them. We check yours first, so there are no surprises.
5.0 from 24 Google reviewsUpfront pricesLicensed & insured

Offers on this job
- $0Call-out feeOn booked jobs, Monday to Friday, 7am to 5pm.
- $200 offSwitchboard upgradeOld fuses or no safety switches? Save on a new switchboard.
- $60 offYour first jobNew customers save on their first booked job.
The $0 call-out is for booked jobs: a time we have set together, with the work going ahead. It applies Monday to Friday, 7am to 5pm. After-hours emergency call-outs have a minimum charge of $349 + GST, and Lachie confirms it on the phone before he drives out.
Why the switchboard matters for solar, batteries and EV chargers
Every one of these connects through your switchboard. If the board can't take it, the install stalls.
Solar needs its own isolating switch Solar
A solar system connects to your board through its own labelled switch, so it can be isolated safely. A full or old board has nowhere to put it.
Batteries add more Battery
A battery needs space on the board too. If you want backup power in a blackout, the circuits it backs up are usually separated onto their own section.
EV chargers draw a lot, for hours EV
A wall charger can draw as much as several heaters at once, often all night. It needs its own circuit, sized for the load, with the right safety switch protection, and room on the board for it.
Old fuse boards and asbestos panels Older homes
Ceramic fuses and boards without safety switches don't suit new work, and panels that may contain asbestos can't be drilled. The board is replaced first, with the asbestos handled by a licensed asbestos professional we work with.
The supply and the meter Sometimes
Solar and batteries need a meter that measures power both ways, usually arranged through your retailer. A big EV charger may need a bigger supply. Mains and meter work is Ausgrid or Level 2 work, and we line up a Level 2 electrician when it is needed.
Signs your board isn't ready
Open the switchboard door and look, without touching anything inside. Any of these usually means work on the board first.
Ceramic fuses
Many installers won't connect a new system to an old rewireable fuse board. It usually means a new board first.
No spare spaces
Solar needs its own isolating switch on the board, a battery may need more, and an EV charger needs its own circuit. A full board has nowhere to put them.
Few or no safety switches
New circuits need safety switch protection under the wiring rules. If your board has none, they have to be added, and an old board may have no room.
A dark backing panel
Older panels may contain asbestos and can't be drilled or added to. Nothing new goes on until the panel is replaced.
Your installer has flagged it
A quote that says 'switchboard upgrade may be required' or 'subject to site inspection' is worth checking before you sign.
Big loads already on the supply
Ducted air con, an induction cooktop, a pool and now an EV charger can add up to more than an older supply was built for.
How we get your board ready
Ideally before you sign the solar, battery or EV quote, so the board isn't a surprise added later.
- 1
Check the board and the supply
Lachie looks at the board, the spare space, the safety switches, the backing panel, the main switch and the supply size, and asks what you're installing.
- 2
Tell you what it needs, if anything
Sometimes it is ready as it is. Sometimes it needs a circuit or two. Sometimes it needs a new board. You hear which and why, with the price before any work starts.
- 3
Upgrade or prepare the board
We fit the new board or the extra circuits, with space set aside and labelled for the solar isolating switch, the battery or the EV charger, so the installer can connect cleanly.
- 4
Work with your installer
We can line up timing with your solar, battery or EV charger installer, so the board is ready when they arrive. You get a Certificate of Compliance for Electrical Work (CCEW) for our work.
Use your board, upgrade it, or upgrade the supply too: your options side by side
Not every board needs replacing for solar or an EV. Here's the straight comparison. You get the price for each before any work starts.
Get the board checked before you sign the solar, battery or EV quote. Then you know the full job up front, and the installer isn't left waiting on an upgrade halfway through.
What you can safely do now
This is not an emergency, but a little prep now saves time and surprises later.
Safe to do now
- Open the switchboard door and take a photo, without touching anything inside. Send it with the form.
- Send us your solar, battery or EV charger quote, or the model you're looking at.
- Note what else you might add in the next few years, like air con, a pool or an induction cooktop.
- If anything trips, reset it once. If it trips again, leave it off and call.
Don't
- Don't sign a quote that says 'switchboard upgrade may be required' without finding out what that means at your place.
- Don't charge an EV through an extension lead or a power board.
- Don't drill or screw into the backing board. Older ones may contain asbestos.
- Don't take covers off the board.
Call straight away if
- A burning smell, buzzing or scorch marks at the board. Switch off the main switch if it's dry and safe to reach, then call. Smoke or fire: call 000, never water.
- The power point you charge your EV from feels warm, smells hot or is discoloured. Stop charging, switch that circuit off at the switchboard if it is safe to reach, and call.
- Solar, a battery or an EV charger keeps tripping the power.
- You feel a tingle or shock from a tap or the shower: call Ausgrid on 13 13 88, then us.
Questions people ask
Do I need a switchboard upgrade for solar?
Not always. If your board has breakers, safety switches and space for the solar isolating switch, it may be ready as it is. Ceramic fuse boards, full boards and asbestos panels usually need upgrading first. We check before you sign.
Do I need a switchboard upgrade for a battery?
Sometimes. A battery needs space on the board, and backup power usually means separating the backed-up circuits. Older or full boards often need upgrading. Ask your installer what they need, and we'll check the board can take it.
Do I need a switchboard upgrade for an EV charger?
Often not, if the board has room and the supply can handle the load. A wall charger needs its own circuit with the right safety switch protection. Old fuse boards and full boards usually need upgrading first.
My solar installer says I need a new switchboard. Is that right?
It may be. Ask them why: ceramic fuses, no room, no safety switches or an asbestos panel are all fair reasons. We can check the board and give you our own answer, with the price, before you decide.
Will I need three-phase power for an EV charger?
Not for most homes. A single-phase wall charger suits most daily driving. Faster three-phase chargers need a three-phase supply, which is a bigger job involving Ausgrid, and not work we do. We check your single-phase board is ready for the charger you choose.
Should I upgrade the board before or after getting solar?
Before, or as part of the same job. Then the installer connects to a board that is ready, you know the full job up front, and nobody has to come back to the same board twice.

Get a free quote from Lachie
Four quick details and Lachie will be in touch. Your quote is back within 24 hours, with no hidden fees.
- Free quotes. Back to you within 24 hours, in plain English, with no hidden fees.
- Upfront pricing. You know the cost before any work starts.
- 100% satisfaction guarantee. Not happy with the work? Lachie comes back and makes it right, free.
- Quality guarantee. Every job done to the Australian wiring rules (AS/NZS 3000), with parts that meet Australian standards, and tested before we leave.
Rather talk it through? Call Lachie on 0402 079 953