Available nowNewcastle, Lake Macquarie & the Hunter · Urgent calls 4am–9:30pm, 7 days

Not an emergency, but don't leave it

Old fuse box? We'll upgrade it, with safety switches on every circuit

Old ceramic fuse boards have no safety switches and no room to grow. We fit a new, labelled board with safety switches on every circuit, priced upfront.

5.0 from 24 Google reviewsUpfront pricesLicensed & insured

Open brick meter box with a new switchboard below the meters

Offers on this job

  • $0Call-out feeOn booked jobs, Monday to Friday, 7am to 5pm.
  • $200 offSwitchboard upgradeOld fuses or no safety switches? Save on a new switchboard.
  • $60 offYour first jobNew customers save on their first booked job.

The $0 call-out is for booked jobs: a time we have set together, with the work going ahead. It applies Monday to Friday, 7am to 5pm. After-hours emergency call-outs have a minimum charge of $349 + GST, and Lachie confirms it on the phone before he drives out.

An old fuse board next to a new switchboard

Your switchboard splits power into circuits and protects each one. Old boards only protect the wiring, and only just. A new board protects the people in the house too.

An old ceramic fuse board compared with a new switchboardLeft: an old meter board on a dark backing panel with a round disc meter, a rotary main switch, ceramic fuses and add-on wiring with no space left. Right: a new switchboard with a main switch, safety switches with test buttons, labelled circuit breakers and spare spaces. BeforeAfter 12345
What the numbers show
  1. Ceramic (rewireable) fuses
  2. No safety switches
  3. An old backing board
  4. No room for anything new
  5. The new board
What you're looking at: Two switchboards side by side. On the left, an old board with ceramic fuses, a round meter and wiring added over the years. On the right, a new board with safety switches that protect people, labelled circuits and room to add more.Simplified drawing. Red shows the fault or a switch that has tripped. Every property is different: Lachie will show you what's going on at yours.
  1. Ceramic (rewireable) fuses

    The fuse wire melts when a circuit is overloaded. They wear, get rewired with the wrong wire, and give no protection against electric shock.

  2. No safety switches

    A safety switch (RCD) cuts the power in a fraction of a second if current leaks through a person. Old boards have none, or one for a few circuits.

  3. An old backing board

    Many older meter boards are mounted on panels that can contain asbestos. We check before we drill or cut, and handle it the right way.

  4. No room for anything new

    Air con, an induction cooktop, solar or an EV charger each need their own circuit. A full board with nowhere to put them is a common reason to upgrade.

  5. The new board

    Every circuit gets safety switch protection, every circuit is labelled, and there is spare space for what you add next.

Why switchboards need upgrading: more detail on each cause

Most upgrades come down to one of these. Older homes often have all of them.

  • Rewireable fuses Most common

    Ceramic fuses protect the wiring, not people. They react more slowly than a circuit breaker, and many have been rewired over the years with the wrong wire, so they no longer protect anything properly.

  • Little or no shock protection

    A fuse or breaker reacts to too much current. A safety switch (RCD) reacts to current leaking to earth, such as through a person, and cuts the power in a fraction of a second. Many older homes have none, or one for the power points only.

  • More load than the board was built for Common with renovations

    Air con, solar and EV chargers each need their own circuit, and the wiring rules (AS/NZS 3000) require safety switch protection on new circuits. An old board often has no room, and sometimes the mains or meter box needs upgrading too.

  • Old backing boards

    Some older backing boards contain asbestos. It's safest left undisturbed, so nothing can be drilled into it, and new work usually means replacing the board. We do that, with the asbestos handled by a licensed asbestos professional we work with.

  • Wear and heat over time

    Connections loosen, insulation dries out and fuse holders crack. It shows up as heat marks, buzzing or a burning smell, and it's a fire risk.

Signs your switchboard is due for an upgrade

Open the board's door and look, without touching anything inside.

  • White ceramic fuses instead of switches

    Rows of ceramic fuse holders, rather than switches you flick back on, mean a rewireable fuse board. Most of them are decades old.

  • No test button on the board

    A safety switch has a button marked T or Test. No button, or just one for the power points, means some circuits have no shock protection.

  • No room for anything new

    No empty spaces means nowhere to add a circuit for air con, an oven, solar or an EV charger. Installers often flag this on their quote.

  • Heat, a smell or a buzz

    A burning smell, scorch marks, buzzing or a board that feels warm means a connection is overheating. That's urgent, not an upgrade for later.

  • A dark, brittle backing board

    Many older boards sit on a black or brown fibrous panel. Some contain asbestos, so leave it alone until it's been checked.

How we upgrade your switchboard

We look at the whole setup first, so the new board suits what you have now and what you'll add later.

  1. 1

    Check the board and what's coming

    Lachie checks the board, the wiring, the earthing and the main supply, and asks what you plan to add: air con, solar, an EV charger or a renovation.

  2. 2

    An upfront price and a day that suits you

    You get a free quote, usually within 24 hours. We agree a day and tell you how long the power will be off. Any meter or mains work is on the quote.

  3. 3

    Fit the new board

    The old fuses come out. The new board has safety switch protection on every circuit, usually an RCBO (breaker and safety switch in one) per circuit, so one fault doesn't black out the house. Every circuit is labelled, with spare space.

  4. 4

    Test it and leave the paperwork

    We test every circuit and safety switch, show you how to reset one, and tidy up. You get a copy of the Certificate of Compliance for Electrical Work (CCEW). If anything isn't right afterwards, we come back and fix it free.

Safety switches, a new board, or a new board plus mains: your options side by side

It depends on the board you have and what you plan to run from it.

Safety switches added to the existing board

Newer breaker boards in good condition, with room to spare

  • The quickest and cheapest way to add shock protection.
  • It doesn't fix ceramic fuses, a full board or an old backing board.
  • As long as the board it goes into.

Full switchboard upgrade

Ceramic fuse boards, full boards and old backing boards

  • Safety switch protection on every circuit, all labelled, with room for what you add later.
  • Costs more, and the power is off for about half a day.
  • Many years, built to the current wiring rules.

Full upgrade plus meter box or mains upgrade

Ducted air, an EV charger or solar with a battery, where the supply is too small or the meter must move

  • Everything sorted in one go, from the street connection to the last circuit.
  • The biggest job. Part of it is booked through Ausgrid, which can add time.
  • Many years, sized for what you plan to add.

Moving a meter, upgrading the mains cable or replacing the main service fuse is work on Ausgrid's side of the supply. It must be done by a Level 2 accredited service provider and arranged with Ausgrid.

What you can safely do now

An old board on its own isn't an emergency. A hot, smelly or wet one is.

Safe to do now

  • Take a photo of the board with the door open, without touching anything inside, and send it with the form.
  • If a breaker or safety switch trips, unplug what was running and reset it once. If it trips again, leave it off and call.
  • Write down what you want to add, like air con or an EV charger, so the quote covers it.
  • Keep kids away from the meter box.

Don't

  • Don't put fuse wire, or anything else, into a blown ceramic fuse. Leave that circuit off and call.
  • Don't drill, screw or cut into the backing board. Older ones may contain asbestos.
  • Don't take covers off the board, or touch it if it's wet, scorched or warm.

Call straight away if

  • A burning smell, buzzing or crackling at the board: if it's dry and not scorched, switch off the main switch and call. If not, keep clear and call.
  • Smoke or flames: get everyone out and call 000. Never put water on an electrical fire.
  • A shock or tingle from a tap, shower or appliance: call Ausgrid on 13 13 88, then call us.
  • Water has got into the meter box or switchboard: keep clear and call.
Call Lachie

What locals say

5.0 from 24 Google reviewsWord for word, nothing edited.

  • We have had Lachie from Cazlec do a lot of work on our home in Merewether. He has always been honest and reliable and we know he will enjoy many years of success.

    todd blatchford, Merewether Google review

  • I've used Lachie @ Cazlec on several occasions now and highly recommend. He does a great job, is reliable, on time, and always leaves everything clean and tidy. Pricing is very fair as well.

    Doug Norton Google review

  • We have the pleasure of working with Lachie and his team at Clarke & Co Property Management for both emergency call-outs and general maintenance work. Lachie is always quick to respond, professional, and happy to help whenever needed. His communication and workmanship are consistently excellent.

    Calais Horrigan Google review

  • Cazlec (Lachlan) did a thorough and tidy job for a very reasonable price. Prompt and professional, I'll happily refer him to others. Thanks!

    Samuel Roberts Google review

  • We've been using Cazlec Electrical for our business and have always been impressed with the quality of service. They arrive when they say they will, and take the time to explain any issues and solutions clearly.

    Bobby Google review

  • Lachlan and his team have been extremely prompt when we have needed an electrician. They are professional and personable and would highly recommend them. No job too small.

    Marie Smith Google review

  • We have used Cazlec Electrical on a number of occasions and have always had a quick response and have been extremely pleased with the work they have done. I would highly recommend this company.

    Terence Coombes Google review

  • I have been using Cazlec Electrical for the last 3 years. Always on time. No hassle and gets the job done. Highly recommend.

    steven thomas Google review

  • Professional and outstanding tradesmen.

    Rob Iacopetta Google review

  • Highly recommend. Great service!

    Sharyn Rogers Google review

More reviews

Questions people ask

How long does a switchboard upgrade take?

A full switchboard upgrade is usually done in one day, with the power off for about half a day. We tell you beforehand how long it will be off. Meter or mains work can take longer if Ausgrid needs to be booked.

Do I need a new switchboard for air con, solar or an EV charger?

Often, yes. Each needs its own circuit with safety switch protection. If your board is full or still has ceramic fuses, there's nowhere to put it, and sometimes the mains or meter box needs upgrading too. It's worth checking before you buy the system.

Are safety switches compulsory in older homes?

For new and altered circuits, yes: the wiring rules (AS/NZS 3000) require them. Existing homes and rentals are not covered by the same rule, but in a NSW rental any electrical fault, including a faulty safety switch, is treated as an urgent repair. Either way, safety switches are what protect people from a serious shock, so we fit them on every circuit.

What if my board has asbestos in it?

It's replaced, not drilled or patched. We fit the new board, and the asbestos is removed by a licensed asbestos professional we work with, to SafeWork NSW rules. Until then, leave it undisturbed. If we think your board may contain asbestos, the quote says so and how it will be dealt with.

Can you just add a safety switch to my old board?

Sometimes. If the board is in good condition and has room, adding safety switches is the cheaper option. Ceramic fuse boards rarely have room, and the fuses are part of the problem, so a new board is usually the better spend.

What paperwork do I get?

A copy of the Certificate of Compliance for Electrical Work (CCEW), which a licensed NSW electrician completes after installation work. Keep it with your house papers. The work is done under contractor licence 459113C.

Lachie

Get a free quote from Lachie

Four quick details and Lachie will be in touch. Your quote is back within 24 hours, with no hidden fees.

  • Free quotes. Back to you within 24 hours, in plain English, with no hidden fees.
  • Upfront pricing. You know the cost before any work starts.
  • 100% satisfaction guarantee. Not happy with the work? Lachie comes back and makes it right, free.
  • Quality guarantee. Every job done to the Australian wiring rules (AS/NZS 3000), with parts that meet Australian standards, and tested before we leave.

Rather talk it through? Call Lachie on 0402 079 953

We use your details only to quote and book this job. Privacy.