Not an emergency, but don't leave it
Old fuse box? We'll upgrade it, with safety switches on every circuit
Old ceramic fuse boards have no safety switches and no room to grow. We fit a new, labelled board with safety switches on every circuit, priced upfront.
5.0 from 24 Google reviewsUpfront pricesLicensed & insured

Offers on this job
- $0Call-out feeOn booked jobs, Monday to Friday, 7am to 5pm.
- $200 offSwitchboard upgradeOld fuses or no safety switches? Save on a new switchboard.
- $60 offYour first jobNew customers save on their first booked job.
The $0 call-out is for booked jobs: a time we have set together, with the work going ahead. It applies Monday to Friday, 7am to 5pm. After-hours emergency call-outs have a minimum charge of $349 + GST, and Lachie confirms it on the phone before he drives out.
An old fuse board next to a new switchboard
Your switchboard splits power into circuits and protects each one. Old boards only protect the wiring, and only just. A new board protects the people in the house too.
- Ceramic (rewireable) fuses
- No safety switches
- An old backing board
- No room for anything new
- The new board
Ceramic (rewireable) fuses
The fuse wire melts when a circuit is overloaded. They wear, get rewired with the wrong wire, and give no protection against electric shock.
No safety switches
A safety switch (RCD) cuts the power in a fraction of a second if current leaks through a person. Old boards have none, or one for a few circuits.
An old backing board
Many older meter boards are mounted on panels that can contain asbestos. We check before we drill or cut, and handle it the right way.
No room for anything new
Air con, an induction cooktop, solar or an EV charger each need their own circuit. A full board with nowhere to put them is a common reason to upgrade.
The new board
Every circuit gets safety switch protection, every circuit is labelled, and there is spare space for what you add next.
Why switchboards need upgrading: more detail on each cause
Most upgrades come down to one of these. Older homes often have all of them.
Rewireable fuses Most common
Ceramic fuses protect the wiring, not people. They react more slowly than a circuit breaker, and many have been rewired over the years with the wrong wire, so they no longer protect anything properly.
Little or no shock protection
A fuse or breaker reacts to too much current. A safety switch (RCD) reacts to current leaking to earth, such as through a person, and cuts the power in a fraction of a second. Many older homes have none, or one for the power points only.
More load than the board was built for Common with renovations
Air con, solar and EV chargers each need their own circuit, and the wiring rules (AS/NZS 3000) require safety switch protection on new circuits. An old board often has no room, and sometimes the mains or meter box needs upgrading too.
Old backing boards
Some older backing boards contain asbestos. It's safest left undisturbed, so nothing can be drilled into it, and new work usually means replacing the board. We do that, with the asbestos handled by a licensed asbestos professional we work with.
Wear and heat over time
Connections loosen, insulation dries out and fuse holders crack. It shows up as heat marks, buzzing or a burning smell, and it's a fire risk.
Signs your switchboard is due for an upgrade
Open the board's door and look, without touching anything inside.
White ceramic fuses instead of switches
Rows of ceramic fuse holders, rather than switches you flick back on, mean a rewireable fuse board. Most of them are decades old.
No test button on the board
A safety switch has a button marked T or Test. No button, or just one for the power points, means some circuits have no shock protection.
No room for anything new
No empty spaces means nowhere to add a circuit for air con, an oven, solar or an EV charger. Installers often flag this on their quote.
Heat, a smell or a buzz
A burning smell, scorch marks, buzzing or a board that feels warm means a connection is overheating. That's urgent, not an upgrade for later.
A dark, brittle backing board
Many older boards sit on a black or brown fibrous panel. Some contain asbestos, so leave it alone until it's been checked.
How we upgrade your switchboard
We look at the whole setup first, so the new board suits what you have now and what you'll add later.
- 1
Check the board and what's coming
Lachie checks the board, the wiring, the earthing and the main supply, and asks what you plan to add: air con, solar, an EV charger or a renovation.
- 2
An upfront price and a day that suits you
You get a free quote, usually within 24 hours. We agree a day and tell you how long the power will be off. Any meter or mains work is on the quote.
- 3
Fit the new board
The old fuses come out. The new board has safety switch protection on every circuit, usually an RCBO (breaker and safety switch in one) per circuit, so one fault doesn't black out the house. Every circuit is labelled, with spare space.
- 4
Test it and leave the paperwork
We test every circuit and safety switch, show you how to reset one, and tidy up. You get a copy of the Certificate of Compliance for Electrical Work (CCEW). If anything isn't right afterwards, we come back and fix it free.
Safety switches, a new board, or a new board plus mains: your options side by side
It depends on the board you have and what you plan to run from it.
Moving a meter, upgrading the mains cable or replacing the main service fuse is work on Ausgrid's side of the supply. It must be done by a Level 2 accredited service provider and arranged with Ausgrid.
What you can safely do now
An old board on its own isn't an emergency. A hot, smelly or wet one is.
Safe to do now
- Take a photo of the board with the door open, without touching anything inside, and send it with the form.
- If a breaker or safety switch trips, unplug what was running and reset it once. If it trips again, leave it off and call.
- Write down what you want to add, like air con or an EV charger, so the quote covers it.
- Keep kids away from the meter box.
Don't
- Don't put fuse wire, or anything else, into a blown ceramic fuse. Leave that circuit off and call.
- Don't drill, screw or cut into the backing board. Older ones may contain asbestos.
- Don't take covers off the board, or touch it if it's wet, scorched or warm.
Call straight away if
- A burning smell, buzzing or crackling at the board: if it's dry and not scorched, switch off the main switch and call. If not, keep clear and call.
- Smoke or flames: get everyone out and call 000. Never put water on an electrical fire.
- A shock or tingle from a tap, shower or appliance: call Ausgrid on 13 13 88, then call us.
- Water has got into the meter box or switchboard: keep clear and call.
Questions people ask
How long does a switchboard upgrade take?
A full switchboard upgrade is usually done in one day, with the power off for about half a day. We tell you beforehand how long it will be off. Meter or mains work can take longer if Ausgrid needs to be booked.
Do I need a new switchboard for air con, solar or an EV charger?
Often, yes. Each needs its own circuit with safety switch protection. If your board is full or still has ceramic fuses, there's nowhere to put it, and sometimes the mains or meter box needs upgrading too. It's worth checking before you buy the system.
Are safety switches compulsory in older homes?
For new and altered circuits, yes: the wiring rules (AS/NZS 3000) require them. Existing homes and rentals are not covered by the same rule, but in a NSW rental any electrical fault, including a faulty safety switch, is treated as an urgent repair. Either way, safety switches are what protect people from a serious shock, so we fit them on every circuit.
What if my board has asbestos in it?
It's replaced, not drilled or patched. We fit the new board, and the asbestos is removed by a licensed asbestos professional we work with, to SafeWork NSW rules. Until then, leave it undisturbed. If we think your board may contain asbestos, the quote says so and how it will be dealt with.
Can you just add a safety switch to my old board?
Sometimes. If the board is in good condition and has room, adding safety switches is the cheaper option. Ceramic fuse boards rarely have room, and the fuses are part of the problem, so a new board is usually the better spend.
What paperwork do I get?
A copy of the Certificate of Compliance for Electrical Work (CCEW), which a licensed NSW electrician completes after installation work. Keep it with your house papers. The work is done under contractor licence 459113C.

Get a free quote from Lachie
Four quick details and Lachie will be in touch. Your quote is back within 24 hours, with no hidden fees.
- Free quotes. Back to you within 24 hours, in plain English, with no hidden fees.
- Upfront pricing. You know the cost before any work starts.
- 100% satisfaction guarantee. Not happy with the work? Lachie comes back and makes it right, free.
- Quality guarantee. Every job done to the Australian wiring rules (AS/NZS 3000), with parts that meet Australian standards, and tested before we leave.
Rather talk it through? Call Lachie on 0402 079 953