Not an emergency, but don't leave it
Asbestos switchboard? We'll replace it safely, following SafeWork NSW rules
An asbestos board in good condition is low risk left alone, but it can't be drilled, cut or added to. We replace it, with the asbestos handled by a licensed asbestos professional we work with, to SafeWork NSW rules.
5.0 from 24 Google reviewsUpfront pricesLicensed & insured

Offers on this job
- $0Call-out feeOn booked jobs, Monday to Friday, 7am to 5pm.
- $200 offSwitchboard upgradeOld fuses or no safety switches? Save on a new switchboard.
- $60 offYour first jobNew customers save on their first booked job.
The $0 call-out is for booked jobs: a time we have set together, with the work going ahead. It applies Monday to Friday, 7am to 5pm. After-hours emergency call-outs have a minimum charge of $349 + GST, and Lachie confirms it on the phone before he drives out.
What we look at on an older board
The asbestos is usually in the backing panel, not the switches. Here's what an older board has, and what replaces it.
- Ceramic (rewireable) fuses
- No safety switches
- An old backing board
- No room for anything new
- The new board
Ceramic (rewireable) fuses
Old fuses mounted on the panel. They usually date the board, and they give no protection against electric shock.
No safety switches
Older boards often have none, or one for a few circuits. New and altered circuits need them, and an asbestos panel makes adding them hard.
An old backing board
The dark, flat panel everything is mounted on. Many older ones contain asbestos. It's low risk left alone and intact, but not to drill, cut or break.
No room for anything new
Adding a circuit means drilling or cutting the panel, so an asbestos board has no room in practice. Solar, air con and EV chargers often stall here.
The new board
A new switchboard in a modern enclosure, with safety switches on every circuit, every circuit labelled and spare space.
Why it matters: more detail on each cause
An asbestos board isn't an emergency on its own. It becomes a problem when it's damaged, or when you need work done on it.
Any new work disturbs it Most common
Adding a circuit, a safety switch, solar or a new meter usually means drilling or cutting the panel. That's what releases fibres, so the work can't go ahead on the old board.
Damage and age
Panels crack, chip and get knocked over the years. A damaged panel is more likely to release fibres than one in good condition.
It was used for decades Older homes
Asbestos was common in older switchboard panels, and Australia banned all use of it at the end of 2003. Many homes still have their original board.
Old fuses, few safety switches
Asbestos panels usually carry ceramic fuses and few or no safety switches. Replacing the panel fixes both at once.
Selling, renting or renovating
Buyers, inspectors and other trades often flag an asbestos board. Replacing it before a renovation keeps the rest of the job moving.
Signs your switchboard may contain asbestos
You can't tell for sure by looking. Only a lab test of a sample confirms it. These signs mean we treat it as asbestos until we know.
A dark, flat backing panel
A black, brown or grey board behind the meter and fuses, often with a smooth face. Many older panels like this contain asbestos, though not all.
An original board in an older home
If the house is decades old and the board has never been replaced, the backing panel is likely original.
Ceramic fuses on the board
Rewireable fuses usually mean an older board, and older boards are the ones most likely to have an asbestos panel.
A warning sticker
Some meter boards already carry an asbestos warning label. If yours does, treat it as asbestos.
An installer has flagged it
A solar, air con or meter installer has said they can't work on your board. An asbestos panel is a common reason.
Cracks, chips or crumbling edges
Damage is the main concern, because it can release fibres. Leave it alone and keep the meter box door closed.
How we replace it safely
We plan the job before anything is touched, so the panel is handled properly and the power is off for as short a time as possible.
- 1
Inspect without disturbing it
Lachie looks at the panel, the meter box, the wiring and the earthing, without drilling, cutting or breaking anything. If it may contain asbestos, we treat it as asbestos.
- 2
Plan it and price it
You get the price before any work starts, a plan for removing the panel, and how long the power will be off. Moving the meter and main fuse is Ausgrid or Level 2 accredited service provider work.
- 3
Remove the old panel safely
The asbestos panel is removed, wrapped and disposed of by a licensed asbestos professional we work with, to SafeWork NSW rules. We book them in, so you deal with one person.
- 4
Fit, test and hand over
A new board goes in with safety switches on every circuit, each one labelled, with room to spare. We test every circuit and you get a Certificate of Compliance for Electrical Work (CCEW).
Leave it, replace the board, or replace the meter box: your options side by side
A straight answer: an intact asbestos board doesn't have to come out today. But it has to come out before any work is done on it. You get the price for each before any work starts.
The asbestos is handled by a licensed asbestos professional we work with, to SafeWork NSW rules, from start to finish. If you're not sure whether your board contains asbestos, treat it as if it does until it's been checked.
What you can safely do now
An asbestos board that's intact and left alone is low risk. Keep it that way.
Safe to do now
- Take a photo of the board with the meter box door open, without touching anything inside, and send it to us.
- Keep the meter box door closed, and keep kids away from it.
- If a safety switch or breaker trips, reset it once. If it trips again, leave it off and call.
- Tell any tradie working near the meter box that the board may contain asbestos.
Don't
- Don't drill, screw, cut, sand or snap anything on the board, or fix anything to it.
- Don't clean it with a brush or broom, hose or pressure wash it, or blow it out with compressed air.
- Don't try to remove the panel or the fuses yourself.
- Don't put fuse wire, or anything else, into a blown ceramic fuse.
Call straight away if
- The panel is cracked, broken or crumbling: keep the door closed, keep everyone away and call us.
- There's a burning smell, buzzing or scorch marks at the board. Switch off the main switch if it's dry and safe to reach, then call. Smoke or fire: call 000, never water.
- Water has got into the meter box: keep clear and call.
- You feel a tingle or shock from a tap or the shower: call Ausgrid on 13 13 88, then us.
Questions people ask
How do I know if my switchboard has asbestos?
You can't be sure by looking. A dark, flat backing panel in an older home is a strong sign, and some have a warning sticker. Only a lab test of a sample confirms it, so we treat it as asbestos until we know.
Is an asbestos switchboard dangerous?
Not while it's intact and left alone. The risk comes when it's drilled, cut, broken or worn, which can release fibres. That's why it's replaced, not worked on, when the board needs anything done.
Do I have to replace my asbestos switchboard?
Not always straight away. If it's in good condition and you don't need work done, it can stay. But you can't add circuits, safety switches, solar or a new meter to it, so most people replace it when they need work.
Who can remove an asbestos switchboard in NSW?
The asbestos has to be handled to SafeWork NSW rules, by people licensed to do it. We work with a licensed asbestos professional who removes the old panel, and we fit the new board. The meter and main fuse are Ausgrid or Level 2 work. We line up each part and tell you what order it happens in.
How much does asbestos switchboard replacement cost?
It depends on the board, whether the meter box needs replacing too, and access. We look at it first and give you the price before any work starts. Nothing goes ahead until you say yes.
How long will the power be off?
A switchboard replacement is usually done in a day, with the power off for about half of it. We tell you beforehand, so you can plan around it. Meter work can take longer if Ausgrid or a Level 2 electrician needs to be booked.

Get a free quote from Lachie
Four quick details and Lachie will be in touch. Your quote is back within 24 hours, with no hidden fees.
- Free quotes. Back to you within 24 hours, in plain English, with no hidden fees.
- Upfront pricing. You know the cost before any work starts.
- 100% satisfaction guarantee. Not happy with the work? Lachie comes back and makes it right, free.
- Quality guarantee. Every job done to the Australian wiring rules (AS/NZS 3000), with parts that meet Australian standards, and tested before we leave.
Rather talk it through? Call Lachie on 0402 079 953