Available nowNewcastle, Lake Macquarie & the Hunter · Urgent calls 4am–9:30pm, 7 days

Switchboard upgrades

Old fuse board? We'll upgrade it to a safe, modern switchboard

We replace old fuse boards with modern breakers and safety switch protection on every circuit, label everything, and leave room for air con, solar or an EV charger.

5.0 from 24 Google reviewsUpfront pricesLicensed & insured

Brick meter box with the door open, smart meters above a new switchboard

Offers on this job

  • $0Call-out feeOn booked jobs, Monday to Friday, 7am to 5pm.
  • $200 offSwitchboard upgradeOld fuses or no safety switches? Save on a new switchboard.
  • $60 offYour first jobNew customers save on their first booked job.

The $0 call-out is for booked jobs: a time we have set together, with the work going ahead. It applies Monday to Friday, 7am to 5pm. After-hours emergency call-outs have a minimum charge of $349 + GST, and Lachie confirms it on the phone before he drives out.

Start with what you can see

Pick the problem that matches. Each page explains what is going on, your options, and what you can safely do now.

Also part of this job

  • Ceramic fuses

    White ceramic fuse holders with fuse wire inside are the old rewireable type. They protect the wiring, not people, and there's no safety switch on those circuits. If a fuse blows, leave it and call. Rewiring it with the wrong wire is a fire risk.

  • No room for a new circuit

    A full board has nowhere to connect a new air conditioner, induction cooktop or EV charger. Sometimes we can add to it. Often it needs replacing.

  • An older meter panel

    Some older meter panels contain asbestos. It's safe left alone but must not be drilled or cut, so we check the panel before we quote. When it needs replacing, a licensed asbestos professional we work with handles the asbestos.

  • Building inspection flagged the board

    Buyers' building and pest reports often note an old board or missing safety switches. We can check it and give you a price to fix it before settlement.

Switchboard work we do

Your switchboard splits the power into circuits and holds the protection that cuts it off before wiring overheats or someone gets a shock. On an old board, much of that protection is missing.

  • Full switchboard upgrades

    Old fuses and breakers out, a new board in with a main switch, circuit breakers and safety switches, all tested. It's usually done in one day, with the power off for about half a day. When it's done you get a copy of the Certificate of Compliance for Electrical Work (CCEW).

  • Safety switch (RCD and RCBO) installs

    A safety switch cuts the power in a fraction of a second if current leaks to earth, for example through a person. We add them to existing boards where there's room and the board is sound, or fit them as part of an upgrade.

  • Ceramic fuse replacement

    Rewireable fuses swapped for modern circuit breakers that trip reliably and reset with a switch. No more fuse wire.

  • Room for air con, solar, EV chargers and renovations

    New appliances and extensions need new circuits. We check what your board can take, then add circuits or upgrade it. Moving the meter or the main service fuse is Ausgrid or Level 2 work.

  • Splitting circuits onto their own safety switches

    If one safety switch covers half the house, one fault blacks it all out. We move circuits onto their own RCBOs, so a fault only drops the circuit it's on.

  • Labelling and tidy-up

    Every circuit clearly labelled, so you, a tenant or the next electrician can find the right switch quickly when something trips.

Recent jobs

Real jobs, real photos.

Cazlec Electrical electrician wiring a new switchboard in an outdoor meter box
New switchboard going in
Meter box with a smart meter, a main switch and a new row of labelled safety switches
New safety switches, every circuit labelled

What locals say

5.0 from 24 Google reviewsWord for word, nothing edited.

  • We have had Lachie from Cazlec do a lot of work on our home in Merewether. He has always been honest and reliable and we know he will enjoy many years of success.

    todd blatchford, Merewether Google review

  • I've used Lachie @ Cazlec on several occasions now and highly recommend. He does a great job, is reliable, on time, and always leaves everything clean and tidy. Pricing is very fair as well.

    Doug Norton Google review

  • We have the pleasure of working with Lachie and his team at Clarke & Co Property Management for both emergency call-outs and general maintenance work. Lachie is always quick to respond, professional, and happy to help whenever needed. His communication and workmanship are consistently excellent.

    Calais Horrigan Google review

  • Cazlec (Lachlan) did a thorough and tidy job for a very reasonable price. Prompt and professional, I'll happily refer him to others. Thanks!

    Samuel Roberts Google review

  • We've been using Cazlec Electrical for our business and have always been impressed with the quality of service. They arrive when they say they will, and take the time to explain any issues and solutions clearly.

    Bobby Google review

  • Lachlan and his team have been extremely prompt when we have needed an electrician. They are professional and personable and would highly recommend them. No job too small.

    Marie Smith Google review

  • We have used Cazlec Electrical on a number of occasions and have always had a quick response and have been extremely pleased with the work they have done. I would highly recommend this company.

    Terence Coombes Google review

  • I have been using Cazlec Electrical for the last 3 years. Always on time. No hassle and gets the job done. Highly recommend.

    steven thomas Google review

  • Professional and outstanding tradesmen.

    Rob Iacopetta Google review

  • Highly recommend. Great service!

    Sharyn Rogers Google review

More reviews

Questions people ask

Do I have to upgrade my switchboard?

Not always. If your board is in good shape and already has safety switches, it may only need a check. The wiring rules (AS/NZS 3000) require safety switch protection on new and altered circuits, so adding air con, solar or a new kitchen often means upgrading.

What's the difference between an RCD and an RCBO?

Both are safety switches. An RCD usually protects a group of circuits, so one fault can turn off several rooms. An RCBO is a safety switch and a circuit breaker in one, protecting a single circuit, so a fault only drops that circuit. Newer boards often have an RCBO on every circuit.

How long is the power off?

A full upgrade is usually done in one day, with the power off for about half a day. We tell you when it goes off and when it's back, so you can plan around the fridge, working from home and any medical equipment. Smaller jobs, like adding one safety switch, are much quicker.

Do I need a new board for solar or an EV charger?

Often, yes. Solar, batteries and EV chargers each need their own protected circuit and space on the board, and an older board may have neither. Send us a photo of your board and tell us what you're planning, and we'll tell you if yours will do.

My meter panel might contain asbestos. Is that a problem?

Not while it's left alone. Asbestos in an old meter panel is only a risk if it's drilled, cut or broken. We do replace asbestos boards: the asbestos is handled by a licensed asbestos professional we work with. Moving the meter involves Ausgrid or a Level 2 provider, and we line that up for you.

Lachie

Get a free quote from Lachie

Four quick details and Lachie will be in touch. Your quote is back within 24 hours, with no hidden fees.

  • Free quotes. Back to you within 24 hours, in plain English, with no hidden fees.
  • Upfront pricing. You know the cost before any work starts.
  • 100% satisfaction guarantee. Not happy with the work? Lachie comes back and makes it right, free.
  • Quality guarantee. Every job done to the Australian wiring rules (AS/NZS 3000), with parts that meet Australian standards, and tested before we leave.

Rather talk it through? Call Lachie on 0402 079 953

We use your details only to quote and book this job. Privacy.